Saturday, February 13, 2010

Week 14:




This week at Fauntleroy the vinyl flooring was installed in both of the bathrooms. The master bathroom has the darker color vanity top with the double bowl sinks and the spare bathroom has the single vanity sink. 

Monday, February 8, 2010

Week 13:
















This past week at Fauntleroy, the laminate flooring was installed in the kitchen, Living room, hallway. The rest of the flooring will be installed later this week and the electrician will finish installing the rest of the lighting throughout the house including the outdoor lamp post. As soon as the weather clears up and the ground dries up a little we will install the drainfield in the backyard. After the drainfield is installed the house will be finished in no time. 

Tuesday, February 2, 2010

Week 12:







This week at Fauntleroy the interior was painted a light brown color chosen by the homeowners. The kitchen cabinets were installed along with the countertops. Flooring is getting ready to be installed throughout the house. The home should be finished by the middle of the month.